Sunday, January 27, 2013

Great Strides!

I can now saw that the Oberwerk is 100% FINISHED!!! Seeing that the Hauptwerk is also on the fast track to being completed, I would say that Opus 1 is around 75% complete!! I think the easiest thing to do is go in order of this weekends progress.

Like I said in the last post, there were two areas of the Oberwerk (OB) that i needed to finish in order to complete the OB. The first was the top molding. I finished painting some of the new molding parts I had to re-cut and then glued them all together. After it dried, as usual, I cut, painted and glued a skin on the top to make it whole.

Oberwerk at 99% Completion


Next was the bottom molding. All I had to do there was glue them on. So, piece by piece, I did just that. Thankfully, it came together rather nicely, especially the molding around the center section. For once, gluing molding didn't raise my blood pressure.




While all of this was drying, I designed the pipe shades for the Hauptwerk (HP) division. Not only that, I ended up cutting out both the top and bottom shades for section 3 as well as all four pipe shades for the tops of section 1. I decided to change the design for the pipe shades for section 3 (the center section). Remember, the grill is wrapped around the pipe guide. I decided to add "wings"to the end which would fit inside the pipe box and help keep the shape of the grill.

The "wings" are on the left and right side

The idea was a great success and I wish I thought about this earlier. Be that as it may, I then sealed, primed and painted them.

BEFORE

AFTER

The four pipe shades for the top of section 1 have all been sealed, primed and painted. However, I didn't glue them on yet. As of now, I will not be putting any grill work on section 2. As the HP continues to come together, I'll make my final decision then.


I've been meaning to give you, the viewer, a better idea of scale. So, I placed a quarter at the bottom left of the model, right next to the left pedal case. I hope these pictures give you a better idea of how large this model actually is.





Here are a few other pictures of the current status of Opus 1.






"The organ is [...] the most complex of all mechanical instruments developed before the
Industrial Revolution. Among musical instruments its history is the most involved and
wide-ranging, and its extent repertory the oldest and largest. No other instrument
has inspired such avowed respect as the organ." (Dictionary of Music and Musicians, 1889)


Sunday, January 20, 2013

You Got to Admit, It's Getting Better...

...it's getting better all the time! Indeed, things are certainly moving along very nice and much progress to the completion of the Oberwerk was accomplished this weekend. First things first, molding consumed most of my time. This includes cutting, painting and gluing. Let me start with my progress with the Hauptwerk before delving into the work accomplished on the Oberwerk.

Both section 2a and 2b are now finished. They are painted and the pipes glued in place. Concerning molding and pipe shades, I have some ideas. However, I won't decide anything until they are glued in place.

Hauptwerk Section 2A and 2B


The molding was also cut for Sections 1A, 1B and 3, that is to say, the two side sections and the center section. You may need to turn your head 180º for this picture.

Molding for Hauptwerk Section 3

Current Status of the Hauptwerk Division


Now onto the Oberwerk (OB). I wish I could say that it is 100% finished. Alas, I cannot. However, I can say it's 98% finished. After I placed all the pipe shades on last weekend, the next step was the top molding for the two pointed sections of the OB. To be honest, I didn't have much problems with the cutting and gluing.

The two top molding features of the Oberwerk


Once they were glued in place, it was time to make two skins to cover all the mess on top of the OB. These skins are very helpful in covering up the gluing mistakes (and even some cutting mistakes) and solidifies it as one piece.






To completely finish the OB, I need to glue the bottom molding which would connect the console area with the OB box. All the pieces are cut and painted and are ready o be glued in place. The top molding of the OB (similar to section 3 of the Hauptwerk) needs to be glued on. If you go back a few posts, I went ahead and glued most of this molding together and waited until now to glue it on. Bad idea. I ended up creating new pieces and salvaging the two ends of the already made pieces. As it stands now, I need to do some final painting and then can glue them all in place.

Sorry - this one came out a bit blurry


I haven't ended a post with an organ video in a while. As I sat thinking about which one, my eyes came upon a statue I have of St. Peter. So, in honor of St. Peter, the first pope, the rock...I end with a video of a young Dame Gillan Weir playing Henri Mulet's Toccata on tu es Petra. I had the honor of being a part of a Master Class with Dame Weir back in 2008 as a student at the University of Florida. (click for picture) Enjoy!




"You are Peter, and on this rock I will build my church, and the powers of death shall not prevail against it.
I will give you the keys of the kingdom of heaven, and whatever you bind on earth shall be
bound in heaven, and whatever you loose on earth shall be loosed in heaven."
- Matthew 16:18-19 RSV -

Sunday, January 13, 2013

GOLD!!

All the grills are glued in placed on the Oberwerk and I'm very pleased with the result. Yes, there are a few things that I wish worked out better, but that's just me being over-critical. I also started painting Section 2 of the Hauptwerk division. Here are the pictures!

Oberwerk Front



Oberwerk Side


Oberwerk with Assembly



Keydesk


Keydesk with Pipes


Hauptwerk - Section 2

Next weekend will be devoted to the molding for the Oberwerk division. So, until next time!


Sunday, January 6, 2013

The Shades are Up!

I dedicated this weekend to just one aspect of the model that really needed to be done...the grill work, also know as pipe shades. So, amidst some other activities this weekend, I managed to FINISH all the shades for the Oberwerk division as well as finish painting the pipes for section three Hauptwerk division.

Pipes (LT and RT) for Section 3 of the Hauptwerk Division


If I really wanted to finish all the Obwerwerk shades, I needed to design the one designated for two "pointed pipes" columns. All in all, I managed to do it all!

Top View

Side View

All that needs to be done now is to seal, prime and paint each one. I currently have applied only one coat of sealer. Throughout the week, I will finish this entire process so I can start gluing them on this weekend.

After the first coat of sealer

So, not a lot of everything, but a whole lot of something. I'm very happy to finish these and looking forward to seeing all that extra gold color amidst all the pipes. Until next time...Merry Christmas and Happy Epiphany! (Yes secular world...we still have one more week of Christmas!)

Tuesday, January 1, 2013

Merry Christmas, Happy New Year and All That Jazz

After a nice two week break away from this project due to Christmas and New Years celebrations, I'm back at it. Surveying the project, I see I still have much more to do, though recognize the great progress within the past few months. There are a few changes that I might make. All will be reveled as time goes on and I come to a decision.

I focused my attention on the Hauptwerk today. The pipes for Section 1 are in place and fit well next to Section 3.



I also decided to scrap Section 2 completely instead of trying to modifying them due to some poor measurement. As I started to cut the new parts and comparing it to the existing section, I realized that I did a very poor job of putting that section together and did not think ahead with how the pipes will fit inside. Both new Section 2's are assembled. I need to sand the sides flat, as one of the supports were put an an angle and now stick out. The pipes are currently in the process of being sealed and painted.



A rough assembly of the Hauptwerk division

A new year is upon us, which means new challenges as well as new opportunities. This model alone brought new challenges for me as well as an opportunity for both my creative and technical side to work side by side. Again, I thank all of you who continue to monitor my progress. Please do not hesitate to leave comments on these posts. Until next time!

Opus 1 - About 80% Complete

Sunday, December 16, 2012

Gaudete - Rejoice!

Indeed we must all rejoice! Christmas is just around the corner and so much has been completed on this project. I admit, I was not all "gung-ho" this weekend when it came to Opus 1 when compared to past weekends. Still, progress was made.

This weekend's progress involved painting the Hauptwerk sections 1 and 3. This includes the box as well as their respected pipes. There are some issues with section 2 that I need to take care of some other time. However, I glued those pipes together. Seen below are the finished pipes for sections 1 and 3. You may need to turn you head 180º for this picture...they were drying when I took the picture.



The center pipes which fit into section 3 were the thorn in my side last weekend. Thankfully, the base which they fit into and keep their shape fits snug into its case. This will help straighten this pipes out.

Hauptwerk Division

That's pretty much the extent of this weekend's work. I now end with some pictures. Below, you'll see one of the angels placed around the area where it will be located. It's just to give us all an idea what these angle would look like on the model.




The following photos are just me having fun with some of my favorite TV characters. All this silliness will, hopefully, culminate into a movie. If time permits and all goes well, I will put together a film of the entire design and construction of Opus 1. The fun (and difficult) part is that it will be shot in front of a green screen. I can then place myself and other characters within the model. So, yes, all this siliness doe shave some sort of purpose.

His Grace (the Pope from Family Guy) came to see the progress of Opus 1. He met with it's curator, Prof. Hubert James Farnsworth (from Futurama).

Oh my, you are much bigger in person!

His Grace was pleased with it's construction and looked forward to it's prospective completion date, which should be around the beginning of March 2013. He will be present to give the organ it's blessing.






Rejoice in the Lord always; again I will say, Rejoice! 
(Phil 4:4 RSV)

Sunday, December 9, 2012

An International Affair

This model really kicked my but this weekend, but more on that in a second. The good thing is that all my shipments arrived by Friday. I realized something - this model has an international component to it. Yes, it is designed similar to an 18th century German Baroque pipe organ. However, the various tools and aesthetics of this model comes from "distant lands" as well.

The most obvious are the four angels from Italy. I didn't get a good picture of all four, so you may want to refer to the photo in my previous post which came from the maker in Italy. Still, the pictures do not serve them justice. I'm very happy with them. The next step would be creating a fixture to mount them to their specific locations. That will be a challenge for another time.

One of four. You can get a little better idea of the size thanks to my hand.

Another aesthetic to this model comes from Nova Scotia. I wanted to find a book of music to place on the music rest. I found a beautiful 1:12 scale book of Gregorian Chant that was made by an artist in Nova Scotia.

To get an idea of size...

Final resting place. A great touch and an awesome find!

So that's Italy, Canada, and all the components that I had to buy for my Dremel table saw (i.e., saw blades, belt, and lubricant) has come from a company in Hawaii. This is not to mention that this little blog of mine has been viewed by people all across the world. According to Blogger, the top 3 countries that have stumbled across my blog are the US of A (666 views), Russia (49 views) and Germany (18 views). Thanks again to everyone who takes the time and looks at my progress. I surprise myself every time take a step back and look what I have made.


Some other progress this weekend includes the pipe work for the Huptwerk. The two "pointed" sections were somewhat painless. However, the center section gave me hell today. Without getting into a lot of detail, which isn't like me, I fixed a few problems and pleased with how it came out.

Section 3 of the Hauptwerk Division

The other components to this section were also created and have been glued.



Last but not least, the dreaded molding. I decided to piece some the top molding for the Oberwerk together first before gluing it to the model. The first half came great. However, I ran into a problem when i started gluing the other half. You should be able to tell in the photo below. It's fixable and you will not be able to tell once it is all glued in place and painted. The small molding which will connect the Oberwerk and console area as also been cut. All that needs to be done is the mid section.


Another week now begins and I leave you with the current song that is playing from my iTunes, Chopin's Polonaise in A-flat major. (Yes, I actually have non-organ music)

Monday, December 3, 2012

The Hevenly Choir of Angels

Although I got a step ahead this weekend with the construction of the first two sections of the Hauptwerk division, I feel that not much was accomplished. Be that as it may, there are several little things that need mentioning. First, to reiterate, I went ahead and made the first two sections of the Hauptwerk division.

Section one (LT) and Section 2 (RT)

I was starting on section 3, which is the middle section, but I've been noticing that my blade is becoming more dull. It goes to show how much I've been using it. I'm at the same point before I bought this one, I'm pushing the wood through instead of the blade doing all the work. There are burn marks on the wood (which you can sort of see in the above picture). So, I went ahead and placed an order for another blade as well as some lubricant to preserve the life of the blade. I'm sure it will allow me to complete all my cutting for Opus 1.

Section 3 will reside in the center

I actually had to change my design slightly which affected this division. The reason is for the four angels that will go in the four "pockets"created between the top of the Oberwerk box and the bottom of the Hauptwerk division. The far left (LL) is created from the left pedal case, the top of the Oberwerk and the left side of the Hauptwerk (Section 1). The center left (CL) and center right (CR) are created from the Hauptwerk and the center section of the Oberwerk. The far right (RR) is created in a similar fasion as LL. You can sort of see them in the below picture.



Point two concerns the angels. Due to the specific size of these "compartments," it has been difficult to find angles that I like and are modeled after the ones on the Müller organ at St. Bavo. I found a company in Italy that does very nice woodworking. I've been communicating with him for the past week, seeing which ones would fit. I first ordered two 10cm angels for the CL and CR spots and 6cm angels for the LL and RR.



After looking at them, I love the 10cm angels, but not that comfortable with the 6cm. I had my reasoning behind the height difference, but went to look through the website again to see if there are other options. After asking for some actual photos of several options, I decided on four angles that are "flying," meaning they have no base. After getting the picture of the artist today, I was happy and they should be shipped in the next day or so.



How, you may ask, will I be mounting these angels if they are supposed to hang from something? Where there is a will there is a way. I'll know a better answer when I have them in my hand, but it will be comprised of a mounting block and a connecting dowel set at an angle. So, they will still look as if suspended in each compartment.

That's all there is for now. I received my shipment of the large molding. However, I'm now waiting for the small molding and that small book of Gregorian Chant which will be placed on the music rack. I forget if I brought that up in my previous posts. Either way, when it comes, you'll see it!


Let's enjoy some Bach at St.Bavo's Church, Haarlem (The Netherlands)